Stock & Domestic Design & Construction – Robinvale

Client: Lower Murray Water
Location: Robinvale, Victoria
Start: 2010
Completion: 2010

Project Description

Design and Construction of Robinvale Domestic and Stock Pipeline System to provide water supply to over 350 landowners in the Robinvale District.

Targets / Performance Outcomes

JHL was successful at completing the project in just 12 short weeks from a standing start. The works included design and approval for 27km’s of PE pipelines, mobilisation to site, conduct land owner liaison and acheive signed access approvals from over 350 property owners, build a database to initiate a future billing system for Lower Murray Water, procure and deliver materials, install the 27kms of pipelines and achieve best practice environmental management in a highly sensitive area.

Refer to article in Local Press for more detail by clicking on this link: local-article-in-paper-24-june

Project Images

Accredited with:

excellence and integrity

JHL Civil Pty Ltd ABN 79144 907 514, 10A Phillip Court, Port Melbourne, Victoria (VIC), 3207 Australia
© Copyright JHL Civil 2013