Esperance PE Sewer Rising Main

Client: Verve Project Management
Location: Sanctuary Lakes, Victoria
Start: 2009
Completion: 2010

Project Description

Construction of a 250mm Poly rising sewer mains including manufacture, supply, and delivery of sewer pipes & fittings, oblique junctions, discs, electrofusion jointing, setting out, excavation, dewatering, bedding, laying, jointing, testing, mechanical compacted backfilling in accordance with City West Water requirements, reinstatement of all work area disturbed by construction and disposal of surplus spoil on site, approved methods of construction by the Corporations’ Contract Engineer & as per WSAA Standard Drawings & regulations.

Targets / Performance Outcomes

Safe installation of pipe line with no LTI’s and a tested network to hand over to City West Water for public usage.

Project Images

Accredited with:

excellence and integrity

JHL Civil Pty Ltd ABN 79144 907 514, 10A Phillip Court, Port Melbourne, Victoria (VIC), 3207 Australia
© Copyright JHL Civil 2013