Client: Utility Services (Thiess / South East Water)
Location: Doysal Avenue, Ferntree Gully
Start: 2012
Completion: 2012
Project Description
The project was the supply and installation of pipe, fittings and concrete pit for the installation of the Pressure Reduction Valve (PRV) and flow meter. The tapping works required careful planning and scheduling as the water main shut downs had to be conducted as night works with change over crews to achieve successful connections. The 300mm MSCL water main required two connections and an in line valve to be installed. The concrete pit was installed in situ with 16mm steel rebar used to ensure the structure would be an asset of South East Water’s for many years to come.
Targets / Performance Outcomes
A safe installation of all works with no LTI’s or disturbance to the public or stakeholders. Successful connections to the live water assets during night works shut down time and reinstatement the VicRoads asset.