Client: Utility Services (Thiess / South East Water)
Location: Devon Street, Cheltenham
Start: 2012
Completion: 2012
Project Description
The project was the supply and installation of pipe, fittings and concrete pit for the installation of the Pressure Reduction Valve (PRV) and flow meter. The tapping works required careful planning and staging as the water mains were deeply located in the busy Warrigal Road. This required scheduled water main shut downs and night works with change over crews to achieve successful connections. A 450mm in line stop valve had to be installed into the MSCL along with two 450mm take offs and a 150mm DICL connection.
Targets / Performance Outcomes
A safe installation of all works with no LTI’s or disturbance to the public or stakeholders. Successful connections to the live water assets during night works shut down time and reinstatement the VicRoads asset.