Construction of Berwick Cranbourne Rd Rising Main Replacement

Client: Utility Services (Thiess / South East Water)
Location: Cranbourne, Victoria
Start: 2012
Completion: 2012

Project Description

The scope of the works was to replace the existing 150mm AC sewer main with the installation of approximately 100m of 180mm PN16 black poly pipe. Works included all excavations, PE welding, pipe laying, testing and all reinstatement works. Stakeholders included South East Water, Melbourne Water, Casey Grammar School and Marnebek School Cranbourne.

Targets / Performance Outcomes

A safe installation of all works with no LTI’s or disturbance to the public or stakeholders. Successful connection to AC sewer mains and reinstatement of Melbourne Water easement and school grounds.

Project Images

Accredited with:

excellence and integrity

JHL Civil Pty Ltd ABN 79144 907 514, 10A Phillip Court, Port Melbourne, Victoria (VIC), 3207 Australia
© Copyright JHL Civil 2013