Client: Utility Services (Thiess / South East Water)
Location: Bakers Road Dandenong North
Start: 2012
Completion: 2012
Project Description
The project was the supply and installation of pipe, fittings and concrete pit for the installation of the Pressure Reduction Valve (PRV). Deep excavations were required for live water main taping of Melbourne Water’s 825mm MSCL pipeline and South East Water’s 150mm AC water main.
Targets / Performance Outcomes
A safe installation of all works with no LTI’s or disturbance to the public or stakeholders. Successful connections to the live water main asset, coordination of water main shut downs when connecting to the AC water main and reinstatement of the Melbourne Water reserve.